Bardoc Project - Gold


The Bardoc Gold Project is centred on the historical Gold mining centre of Bardoc, located 45 kilometres north of Kalgoorlie. Nickelore controls 100% of the project, which has a combined tenure area of approximately 50 square kilometres and encompasses over 15 kilometres of strike of the Bardoc Tectonic Zone (BTZ). Project access is extremely good with excellent proximity to both infrastructure and gold processing plants.

Both the geological and structural setting at Bardoc are extremely prospective for large scale gold mineralisation as is evident by the numerous mining centres in the immediate area, including the very successful Paddington deposit (4Moz). Major gold deposits in the area are associated with the Bardoc Tectonic Zone (BTZ), a broad structural regime that extends over a strike length of 75 kilometres and hMenzies Hotelosts in excess of 6Moz of gold.

Following the acquisition of the Bardoc Gold Project, Nickelore completed an extensive data review and target generation exercise designed to identify both regional and local exploration targets. The regional analysis identified several large mineralised structures that intersected within the Bardoc Gold Project. These structural intersections are highly significant as they have historically hosted large gold deposits in the broader Bardoc area making them a high priority target for future exploration.

In addition to the regional analysis, Nickelore has completed a detailed review of local mineralisation with a specific focus identifying high-grade gold occurrences that have had little or not testing at depth. Results revealed that due to the lack of any significant exploration below the top 50 metres, Bardoc contains a large number of high grade targets that have never been tested.

Nickelore prioritised these targets in preparation for several phases of exploration involving RAB, RC and diamond drilling scheduled for second half of 2003. The Company has selected targets based on their commercial potential to produce either a “stand alone” deposits, or toll treatable ore bodies.



As the Bardoc Gold Project is so strategically located both in terms of infrastructure, structural setting, and proximity to major gold deposits the Company is faced with a large number of potential exploration targets. Substantial effort has been focussed on selecting the most prospective of these targets to give Nickelore the best possible opportunity for exploration success.

Following an extensive data review and target generation exercise, designed to identify both regional and local exploration targets within the Bardoc Project area, the Company completed 2,341 metres of rotary air blast (RAB) 3,229 metres of reverse circulation (RC) and 407.6 metres of diamond core drilling. The drilling produced significant results from several prospects including Bulletin South, Excelsior and Zoroastrian; highlights of these results are detailed in Table 1.

In January 2004 Nickelore acquired the Bardoc South tenure, which encompasses the southern extension of the Aphrodite Deposit (892,000 oz gold) and the immediate northern extension of the Broad Arrow Gold Mines ( 600,000 oz gold). This combined with the additional 63,000 oz of gold resources has significantly enhanced the Company’s gold assets.

Similarly, Nickelore has conducted a detailed analysis of the Bardoc South area to delineate structurally controlled, high-grade gold targes for drill testing. A total of 7.094 metres of RAB, 1,081 metres of RC and 830 metres of aircore drilling was subsequently completed. This work resulted in a number of significant results from the Big Blow, Jackorite and Nerrin Nerrin prospects, highlights of which are detailed in Table 1.

Table 1: Significant assay results from drilling at the Bardoc Project for the year ended 30 June 2004

Hole No.
Prospect
Northing
AGD 84
Easting
AGD 84
Depth From
Interval
Gold Grade
HBUC 001
Bulletin South
6634560m
333998m
112m
1m
30.4g/t
HBUC 006
Bulletin South
6634520m
333966m
98m
5m
5.7g/t
HBUC 007
Bulletin South
6634540m
333969m
79m
2m
10.6g/t
HEXCD 003
Excelsior
6642986m
335422m
209.4m
31.2m
1.8g/t
HZOC 003
Zoroastrian
6642865m
334569m
132m
7m
4.7g/t
HJKC 003
Jackorite
6640000m
336976m
23m
11m
9.6g/t
HJKC 003
Jackorite
6640000m
336976m
51m
5m
36.3g/t
HBBC 001
Big Blow
6639320m
336444m
41m
5m
8.8g/t
HBBC 003
Big Blow
6639280m
336449m
39m
3m
8.4g/t
HNNC 002
Nerrin Nerrin
6639290m
335570m
60m
3m
11.5g/t

Note: All RC intersections are derived from 1 metre samples that have been riffled split and analysed by fire assay. Diamond Core intersections are derived from lithologically dependent sample lenths that have been cut in half and analysed by fire assay.

Due to the focus on Nickel Sulphide exploration only 2 small gold drilling programs (for 483 metres of rotary air blast (RAB) and 201 metres of RC drilling) were completed last year but without significant results.

Nevertheless, the Nickel drilling did often go through areas of known and unknown gold potential at depths previously untested. The result was that significant values were intersected at the basal contact that was often represented by a chert horizon that when in-filled with porphyry was often mineralised as showing in HNIC001 and HNIC013 in Table 2. In the other case for HNIC019 and HNIC022, high grade gold was intersected in new gold trends (North-North-East) within the footwall basalt that had not been previously recognised at Bardoc.

Regionally, the project sits on such a structural corridor (Black Flag Fault) which is an important determinant for deposits at Kundana ( 5Mozs) and Mount Pleasant ( 3Mozs). Consequently, these prospects have now become priority drill targets for Nickelore.

Table 2: Significant Gold results from drilling at the Bardoc Project for the year ended 30 June 2005

Hole No.
Prospect
Northing AGD 84
Easting AGD 84
Depth From
Interval
Gold Grade
HNIC 001 Nickel Target
6636492m
337149m
242m
3m
4.4g/t
HNIC 013 Nickel Target
6640363m
336561m
170m
4m
5.4g/t
HNIC 019 Marmont
6646212m
336063m
200m
4m
9.9g/t
HNIC 022 Ajax
6641253m
336268m
286m
5m
15.7g/t

Note: All RC intersections are derived from 1 metre samples that have been riffled split and analysed by fire assay, except for HNIC022 where the samples were done by the Leachwell method using a 1kg change.

  

Nickelore Limited
Level 2, 45 Richardson Street,
West Perth WA 6005 

PO Box 568,
West Perth WA 6872 

tel:       +61 8 9481 2433
fax:      +61 8 9322 5907
email:  info@nickelore.com.au

.

Privacy Notice | Site Map
© 2007 Nickelore Ltd
 
  formerly Halcyon Group Limited